Closing Date and Time: July 17, 2024, 2:00 pm
The Thompson-Nicola Regional District is seeking proposals for equipment supply of a prepackaged wastewater treatment plant system for the Pritchard Wastewater Treatment Plant upgrade project. The prepackaged wastewater treatment plant system shall utilize Membrane Bioreactor (MBR) technology. The purpose of this RFP is to select a wastewater treatment plant Vendor whose equipment will then be specified in the detailed design and tendering of the upgraded wastewater treatment plant.